WBK is partnering with Oglala Sioux Tribe Public Works to mitigate chronic flooding on large portions of the Pine Ridge Reservation that results in many roadways that are unsafe if not unusable. The project brings together WBK transportation engineering experience with critical expertise from our water resources team.
Phase I included existing documentation review and sending an assessment team to the reservation to prepare and deliver a report and recommendations. The WBK team recommended installation of new drainage and stormwater management systems along with elevating and upgrading the existing dirt and gravel roadways on the Pine Ridge Indian Reservation.
Utilizing grant funding the Tribe has received, Phase II includes design and implementation of road improvements, including installation of new culverts under the roads at up to 50 sites accounting for more than 20 miles of roadway. WBK is honored to deliver innovative and environmentally sustainable solutions for the Oglala Sioux Tribe and its citizens.
If you are interested in beginning a new project, you are a potential teaming partner, or you just want to chat about great architecture and engineering, please drop us a note.
Bodwé Professional Services
415 E. Prairie Ronde St.
Dowagiac, Michigan 49047
Toll-Free: 877-649-0492
269-585-2270
Seven Generations Architecture + Engineering
600 E. Michigan Ave.
Suite B
Kalamazoo, MI 49007
269-927-0144
3463 Magic Drive,
Suite T15
San Antonio, TX 78229
The Steelhead Engineering Company
259 E. Michigan Ave.
Suite 407
Kalamazoo, MI 49007
269-585-2255
WBK Engineering
116 W. Main St.
Suite 201
St. Charles, IL 60174
630-443-7755
68 E. Michigan Ave.
Battle Creek, MI 49017
269-224-3182
Blue Star Integrative Studio
320 S. Boston Ave.
Ste. 1710
Tulsa, OK 74103
918-359-5640