The Annie Glidden Road at Fairview Drive intersection was in need of widening and pavement repair. While the intersection improvement was previously included in an approved Phase I study along Annie Glidden Road, a new PDR was required to receive IDOT/FHWA approval. To ensure the City could utilize $800,000 in federal funding prior to expiration of a legacy Federal earmark, WBK completed both Phase I and II concurrently.

Members of the team conducting an environmental survey before construction.

The following items were included in the Phase I and Phase II scope of services:

• Topographic Site Survey and Existing ROW

• Plats and Legal Descriptions

• Geotechnical Investigation

• Geometric Design, Intersection Analysis, and Intersection Design Study

• Wetland Delineation and Report

• Environmental Surveys

• Location Drainage Analysis

• Project Development Report

• Public Involvement

• IDOT and Tollway Coordination

• Phase II Plans, Specifications, and Estimate

Subsequent to a successful bid, WBK was engaged to provide construction management and oversight. The challenges of construction included coordination with an adjacent Tollway project that impacted the I-88 and Annie Glidden interchange, Northern Illinois University student and football events/traffic, and adjacent user concerns with access. Utility relocations created schedule challenges; however, all of the underground utility improvements and pavement/geometric improvements were completed in 2018. The final traffic signal improvements were completed in the spring of 2019.

Phase III: intersection construction

WBK Engineering (WBK) was responsible for the following tasks during construction on this project:

• Full-Time Construction Observation and Documentation

• Utility Relocation Coordination with ComEd, Comcast, and Metro Net

• Weekly day-time and bi-weekly night-time traffic control inspections

• Weekly Soil Erosion & Sediment Control Inspections

• Pay Estimates & Change Orders

• Extension of Time Requests

• Project Documentation in accordance with IDOT Procedures, utilizing ICORS

• Project Closeout with IDOT and City of DeKalb

Contact us

If you are interested in beginning a new project, you are a potential teaming partner, or you just want to chat about great architecture and engineering, please drop us a note.

Bodwé Professional Services

415 E. Prairie Ronde St.
Dowagiac, Michigan 49047
269-585-2270

Seven Generations Architecture + Engineering

600 East Michigan Avenue
Suite B
Kalamazoo, MI 49007
269-927-0144

3463 Magic Drive,
Suite T15
San Antonio, TX 78229

The Steelhead Engineering Company

259 E. Michigan Ave.,
Suite 407
Kalamazoo, MI 49007
269-585-2255

WBK Engineering

116 W. Main St.
Suite 201
St. Charles, IL 60174
630-443-7755

68 E. Michigan Ave.
Battle Creek, MI 49017
269-224-3182

Blue Star Integrative Studio

320 S. Boston Avenue
Ste. 1710
Tulsa, OK 74103
918-359-5640

Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.