As part of the Stearns Road Corridor and Bridge project, the Record of Decision for the final Environmental Impact Statement proposed wetland mitigation to help protect existing sensitive resources and the creation of additional wetlands to mitigate any wetland impacts incurred as a result of the corridor-wide project and bridge. The resulting Adaptive Management Plan is included as part of the United States Army Corps of Engineers permit requirements and project environmental commitments.
Bodwé WBK Engineering (WBK) prepared the plans, specifications, and estimates for the project. The Adaptive Management Plan was let in December of 2008 for construction, and the contract was awarded. Construction was initiated in the spring of 2009, with WBK as the on-site Resident Engineer during construction.
The project is located on five parcels and includes three project sites, located adjacent to the intersection of the proposed Stearns Road and Illinois Route 25 in unincorporated Kane County, Illinois. The parcels include the Roloff Property, Sandhill Annex, Whitegate Farm, Bio-Gro, and Elmhurst Chicago Stone.
Bodwé WBK Engineering provided the following services on this project:
If you are interested in beginning a new project, you are a potential teaming partner, or you just want to chat about great architecture and engineering, please drop us a note in this form.
If you have an RFQ/RFP to submit for consideration, please email us at marketing@bodwegroup.com.
Michigan Offices
415 E. Prairie Ronde St., Dowagiac, Michigan 49047
877-649-0492
600 E. Michigan Ave. , Ste. B, Kalamazoo, MI 49007
269-927-0144
68 E. Michigan Ave., Battle Creek, MI 49017
385 Leonard St. NE, Suite 201, Grand Rapids, MI 49503
269-927-0144
Illinois Office
116 W. Main St., Ste. 201, St. Charles, IL 60174
630-443-7755
Oklahoma Office
320 S. Boston Ave., Ste. 1710, Tulsa, OK 74103
918-359-5640