City of Geneva, Illinois

City of Geneva Comprehensive Watershed Study

Geneva, Illinois
Municipal
2022
Home
40 acres
Size
$16M
Planned Capital Improvements
3 years
Timeline

The City of Geneva selected WBK Engineering to help develop a comprehensive approach to understanding and managing existing drainage and infrastructure conditions within the City of Geneva.

Insufficient drainage infrastructure inhibited access to businesses in the City of Geneva.

The overarching purpose of this study was to identify and effectively address the stormwater issues affecting the City and its residents and businesses. It was intended to improve decision making by informing City staff and elected officials of concerns related to drainage infrastructure throughout the City, identify a proposed drainage improvement program, and identify funding and budget needs for such a program. The study was comprised of three main components; data gathering through public input, analysis of drainage issues and design of mitigation measures, and economic analysis and capital plan development.

Public engagement was the first step in providing a comprehensive understanding of drainage challenges and concerns experienced by residents and businesses. Three methods of gaining public input were completed; a public web portal, an open house, and interaction with residents following a May 2020 storm event.

The location and severity of drainage issues varied across the City. A total of 25 study areas were identified. Each study area was evaluated to determine the cause of the issue, and drainage improvements identified to resolve the drainage concern documented. In five study areas, the nature of the recommendations warranted a phased and multi-year approach to construction of drainage improvements.

One of the primary objectives for the study was the development of a capital plan, intended to be long-range with a horizon of 10 years, split into two distinct phases. For the 25 identified study areas, project costs were developed which included construction as well as soft costs for engineering and, in some cases, land acquisition.

Projects were prioritized and programmed through an interactive discussion with City staff recognizing community benefit, risk, and an effort to spread costs across a five-year horizon. Concept level drainage improvements, along with opinion of costs, were identified for each of the 25 project areas.

The total cost for the project was estimated to be $16.2 million. Phase one of the plan (years 1 through 5) had an estimated cost of $7.4 million with an average annual expenditure of $1.5 million.

Contact us

If you are interested in beginning a new project, you are a potential teaming partner, or you just want to chat about great architecture and engineering, please drop us a note in this form.

If you have an RFQ/RFP to submit for consideration, please email us at marketing@bodwegroup.com.

Bodwé Professional Services

415 E. Prairie Ronde St.
Dowagiac, Michigan 49047
Toll-Free: 877-649-0492
269-585-2270

Seven Generations Architecture + Engineering

600 E. Michigan Ave.
Ste. B
Kalamazoo, MI 49007
269-927-0144

3463 Magic Dr.
Ste. T15
San Antonio, TX 78229

The Steelhead Engineering Company

259 E. Michigan Ave.
Ste. 407
Kalamazoo, MI 49007
269-585-2255

WBK Engineering

116 W. Main St.
Ste. 201
St. Charles, IL 60174
630-443-7755

68 E. Michigan Ave.
Battle Creek, MI 49017
269-224-3182

Blue Star Integrative Studio

320 S. Boston Ave.
Ste. 1710
Tulsa, OK 74103
918-359-5640

By submitting this form, you agree to our Terms of Use.
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.